A challenging feat, this building scaling 13 floors erected as two architectural structures required our team to overcome certain obstacles.
Fun facts:
- The davits arms had to be set up on different roofs in order to be able to complete certain drops.
- The drop between both structures required our team to work with a section of the swing-stage 15ft away from the building.